
Work Performed
Objective
Improve process utility monitoring while retaining the existing piping configuration.
Work Performed
Installed compatible flow meters and added monitoring for chemical, DIW and air lines.
Controls
Integrated the new signals into the equipment interlock logic and verified operation.


