What to check before replacing an obsolete PLC or HMI

A migration checklist covering source programs, I/O, communications, operating sequence, downtime and recovery planning.

A model number is not enough

Replacement may involve the original program, I/O, connected drives and instruments, SCADA links and operator sequence—not just the controller hardware.

Collect the available material

Share equipment labels, source program and settings availability, drawings, I/O lists, communication links and permitted downtime.

Agree on a phased scope

Configuration review, PLC/HMI work, changeover checks and backup deliverables are defined before physical replacement.