Condition-Based Maintenance

Industrial Control System Assessment & Preventive Diagnostics

Assessment of PLC, SCADA, sensors, communications and alarm history to identify practical maintenance priorities and phased improvements.

When to contact us

  • Program and PC backups are incomplete or their locations are unclear.
  • The same alarms repeat without a clear cause or action history.
  • Pump runtime and sensor data are not connected to maintenance planning.

Work scope we can review

  • PLC/HMI/SCADA architecture and backup readiness
  • Alarm, communication and data collection review
  • Runtime and sensor-based inspection items
  • Prioritized improvement plan

Typical deliverables

  • Assessment findings
  • Backup, obsolescence, communication and alarm checklist
  • Priority actions and next-step options
Inspection intervals and thresholds are agreed using equipment manuals, operating conditions and available site records.

Technical guides

Where to start preventive control-system checks without an in-house PLC engineer →

View related field projects →

Start with the equipment model and current symptom.

Send the equipment or controller model, current issue and preferred schedule. We will reply with the information needed to define the work scope.

Email a Technical Inquiry ↗