
Work Performed
Site Requirement
Important auxiliary equipment data was not connected to the main CVD tool.
Work Performed
Built equipment-specific controllers, connected field sensors and integrated the signals into a central monitoring system.
Result
Operators can monitor current conditions, alarms and historical data from a unified SCADA interface.





